Oakway Substation

Scope of work

Ram Jack West installed 4 vertical helical and 2 tie backs on regular pad to lift the pad to maximum practical recovery. EWEB had a short time frame to de-energize and re-energize the transformer to do the scope of work. The recovery was fully accomplished due to Ram Jack's installation and product. The transformer had 100% recovery and re-energized in the time frame expected.

Location
Eugene, Oregon
TYPE OF PROJECT
type of work
Helical Piles